WN
WAKEUP NUCLEAR Independent Dosimetry & PPE Standards (.org)
← All Benchmarks & Reports
EAST ASIA DOSIMETRY AUDIT // DOC: WN-EASTASIA-2026-1118

Yongbyon 5-MW Seventh Irradiation Cycle & Enrichment Expansion: East Asia Urban Fallout vs. Reactor Plume Dosimetry

On November 18, 2026, IAEA Director General Rafael Grossi informed the 35-nation Board of Governors that satellite imagery confirms North Korea completed exterior construction on an extension to its original uranium-enrichment plant at Yongbyon (started mid-September, externally complete late October 2026), while its 5-megawatt (5-MW) plutonium reactor continues operating in its seventh irradiation cycle alongside an active light-water reactor (Arab News / Reuters; WHBL / Reuters).

1. East Asia Dual-Source Plume Comparison (Seoul / Tokyo / Okinawa Corridors)

Source Term Dominant Isotopes / Chemical Species KI Tablet & N95 Efficacy Verified Continuity Standard
5-MW Reactor (7th Cycle) & LWR Core Iodine-131 + Cesium-137 (662 keV) + Strontium-90 Partial I-131 thyroid only; 0.0% Cs-137 photon shielding 0.25mmPb Core + EN 12941 TH3 P3 PAPR
Yongbyon / Kangson Uranium Enrichment UF6 → Hydrofluoric Acid (HF) + UO2F2 0.0% Efficacy (Zero Iodine-131; HF corrodes N95) Multi-Gas CBRN Canister + Positive-Pressure Hood
East Asia Continuity & Evacuation Links

Model regional plume dispersion at AtomicOversight.org, inspect the 2026 5-Suit Benchmark, or review the Seoul–Tokyo Corridor 72-Hour Vehicle Contingency Kit.